• Login / Join
  • About
  • •
  • Contact
  • •
  • Advertising
bustler logo
bustler logo
  • News
  • Competitions
  • Events
  • Bustler is powered by Archinect
  • Sign up for Bustler's Email Newsletters

  • Follow these Bustler feeds:

  • Search

    Search in

  • Submit

    What are you submitting?

    News Pitch
    Competition
    Event
  • Login / Join
  • News|Competitions|Events
  • Search
    | Submit
    | Follow
  • Search in

    What are you submitting?

    News Pitch
    Competition
    Event

    Follow these Bustler feeds:

  • About|Contact|Advertising
  • Login / Join

Kaohsiung Port Terminal by Reiser + Umemoto

By Bustler Editors|

Monday, Dec 13, 2010

View from land

Last Friday, Reiser + Umemoto, in collaboration with Fei and Cheng and Associates (Taipei), Ysrael A. Seinuk, PC (New York) and Arup (Hong Kong), were announced First Prize winners in the Kaohsiung Port and Cruise Service Center International Competition. Today, the architects also sent us first images and a description of their winning project.

This new development will be located in the city of Kaohsiung in southern Taiwan, ROC.

Project Description:

For the Kaohsiung Port Terminal, we propose a dynamic 3-dimensional urbanism that takes advantage of the site’s unique lateral positioning with respect to the city grid.  Existing public pedestrian flows along the proposed elevated boardwalk can be amplified, rather than interrupted by creating a continuous elevated public esplanade along the waterfront. Cruise and ferry functions, meanwhile, are located just below the public level and are kept distinct to maintain secure areas for departing/arriving passengers.

View from water

The Main Hall splits up into three different partitions, each related to a different itinerary for travelling by ship, while the concourses are oriented parallel to the waterfront to maximize the interface between water and land.  By vertically separating the functions of the general public, port business, and travelers along this waterfront edge we are able to keep the various operational uses highly efficient while at the same time allowing for the synergy of mixed functions for the general public.

Model perspective

Vertical circulation is organized around thickened zones in the building’s skin which also house structure, utilities, and ventilation. The structure is a system of nested, long-span shells, which are composed of an underlying steel pipe space frame which is sandwiched by cladding panels to create a useable cavity space.  Overall an experience of directed yet funactionally separated flows will lend an aura of energy to the point terminal space.

Model elevation

An essential component to the vitality of the Port Terminal Project is the connection to a proposed elevated public space along the waters’ edge. The importance of this waterfront space which is distinct yet connected to the city of Kaohsiung is inestimable.

Model lit

The boardwalk links the new Pop Music Center, the arts and shopping districts within a green necklace along the waterfront. The boardwalk will be a 24 hour space that fosters shopping, dining, and recreation. Moreover, connection to this vital public conduit will ensure the continuous economic viability of the port terminal, sustaining and amplifying the periodic maritime uses of the cruise terminal and ferries.

Model boardwalk

The project is scheduled for construction in 2012 and expected to be in operation by 2014, with a construction budget of approximately $85,000,000 USD.  The competition is sponsored by the Kaohsiung Harbor Bureau, Ministry of Transportation and Communications, Taiwan, ROC.

Section longitudinal
Site Plan
Main level plan - cruise departures
G+3 level plan

All images courtesy Reiser + Umemoto.

Related

taiwan ● sea ● reiser + umemoto ● port terminal ● port ● kaohsiung ● asia

Share

  • Follow

    0 Comments

  • Comment as :

Kaohsiung Port Terminal by Reiser + Umemoto

World’s most beautiful commercial stores of 2026 selected by Prix Versailles

Sponsored Post by Buildner

Buildner’s Unbuilt Award 2026 advance registration deadline is approaching!

Eight innovative timber projects honored at 2026 Wood in Architecture Awards

Beautiful brick architecture honored at BRICK AWARD 26

Over $500,000 awarded to architectural discourse projects by Graham Foundation

Best in urban planning recognized at AIA Regional & Urban Design Award 2026

Sponsored Post by Buildner

Re:Form - New Life for Old Spaces / Edition #3 advance registration deadline is approaching!

New architecture and design competitions: IDEAS Awards, UIA-HYP CUP International Student Competition, Vancouver Tall Challenge, and Memorial to the Sixth Extinction

Sign up for Bustler's Email Newsletters

Best small projects chosen at AIA Small Project Award 2026

10 standout sustainable projects honored at AIA COTE Top Ten Award 2026

Best residential architecture of 2026 honored at AIA Housing Award

Best new interiors of 2026 chosen at AIA Interior Architecture Awards

Best global architecture honored at RIBA International Awards 2026

World’s most beautiful airports of 2026 chosen by Prix Versailles

New architecture and design competitions: Brick in Architecture Awards, Study Architecture Student Showcase, N.Y.C. Groceries, and New York High Falls Riverfront Market

Next page » Loading

Kaohsiung Port Terminal by Reiser + Umemoto

By Bustler Editors|

Monday, Dec 13, 2010

Share

View from land

Related

taiwan ● sea ● reiser + umemoto ● port terminal ● port ● kaohsiung ● asia

Last Friday, Reiser + Umemoto, in collaboration with Fei and Cheng and Associates (Taipei), Ysrael A. Seinuk, PC (New York) and Arup (Hong Kong), were announced First Prize winners in the Kaohsiung Port and Cruise Service Center International Competition. Today, the architects also sent us first images and a description of their winning project.

This new development will be located in the city of Kaohsiung in southern Taiwan, ROC.

Project Description:

For the Kaohsiung Port Terminal, we propose a dynamic 3-dimensional urbanism that takes advantage of the site’s unique lateral positioning with respect to the city grid.  Existing public pedestrian flows along the proposed elevated boardwalk can be amplified, rather than interrupted by creating a continuous elevated public esplanade along the waterfront. Cruise and ferry functions, meanwhile, are located just below the public level and are kept distinct to maintain secure areas for departing/arriving passengers.

View from water

The Main Hall splits up into three different partitions, each related to a different itinerary for travelling by ship, while the concourses are oriented parallel to the waterfront to maximize the interface between water and land.  By vertically separating the functions of the general public, port business, and travelers along this waterfront edge we are able to keep the various operational uses highly efficient while at the same time allowing for the synergy of mixed functions for the general public.

Model perspective

Vertical circulation is organized around thickened zones in the building’s skin which also house structure, utilities, and ventilation. The structure is a system of nested, long-span shells, which are composed of an underlying steel pipe space frame which is sandwiched by cladding panels to create a useable cavity space.  Overall an experience of directed yet funactionally separated flows will lend an aura of energy to the point terminal space.

Model elevation

An essential component to the vitality of the Port Terminal Project is the connection to a proposed elevated public space along the waters’ edge. The importance of this waterfront space which is distinct yet connected to the city of Kaohsiung is inestimable.

Model lit

The boardwalk links the new Pop Music Center, the arts and shopping districts within a green necklace along the waterfront. The boardwalk will be a 24 hour space that fosters shopping, dining, and recreation. Moreover, connection to this vital public conduit will ensure the continuous economic viability of the port terminal, sustaining and amplifying the periodic maritime uses of the cruise terminal and ferries.

Model boardwalk

The project is scheduled for construction in 2012 and expected to be in operation by 2014, with a construction budget of approximately $85,000,000 USD.  The competition is sponsored by the Kaohsiung Harbor Bureau, Ministry of Transportation and Communications, Taiwan, ROC.

Section longitudinal
Site Plan
Main level plan - cruise departures
G+3 level plan

All images courtesy Reiser + Umemoto.

Share

  • Follow

    0 Comments

  • Comment as :

Archinect JobsArchinect Jobs

The Archinect Job Board attracts the world's top architectural design talents.

VIEW ALL JOBS POST A JOB

Interior Designer

Megan Grehl

Interior Designer

New York, NY, US

Senior Designer / Architect

NardiHaus

Senior Designer / Architect

Pasadena, CA, US

Junior/Intermediate Architect

Archimaera Architecture

Junior/Intermediate Architect

New York, NY, US

Designer

Jayson Architecture

Designer

San Francisco, CA, US

Project Designer

The Brooklyn Studio

Project Designer

Brooklyn, NY, US

Intermediate Architect - Retail (AutoCAD-based)

O'Neil Langan Architects

Intermediate Architect - Retail (AutoCAD-based)

New York, NY, US

Associate Designer - Architecture

IS Architecture

Associate Designer - Architecture

La Jolla, CA, US

Project Manager

The Brooklyn Studio

Project Manager

Brooklyn, NY, US

Project Architect

The Goldman Group

Project Architect

Walpole, MA, US

Project Designer / Job Captain

Kadre Architects, Inc

Project Designer / Job Captain

Los Angeles, CA, US

Next page » Loading